234 - Tunnel to the Elevator, Chimney Rock, N.C
Additional Details:
THE PEDESTRIAN TUNNEL LEADING TO THE ELEVATOR AT CHIMNEY ROCK This tunnel and the elevator shaft were blasted out of the solid granite cliff, taking nine months and eight tons of dynamite to open up the passages. The tunnel pictured is 7x7 feet inside dimensions and lighted by fluorescent fixtures, with a total length of 196 feet |