Road & Tunnel in Shoshone Canyon, Cody Road, Yellowstone NP
Additional Details:
| At the time of building the Shoshone Dam a 300-ft. tunnel was constructed through solid granite to take care of the overflow from the Shoshone reservoir. Also seen is one of the many tunnels necessary to bore through solid granite in the construction of the road. |