Bureau of Reclamation's Glen Canyon Project
Additional Details:
| Making use of its 25-ton cableway, the general contractor on the Glen Canyon Project, Merritt-Chapman & Scott Corp., moves from one bank to the other in a matter of minutes heavy equipment which prior to the erection of the cableway required a road trip of over 200 miles. The truck shown here is the famous Payhauler (25-ton capacity), a product of the International Harvester Corporation. |