Skagit Hydroelectric Project. This incline railway, driven by a 400-horsepower electric motor and with a lifting capacity of 158,000 pounds, lifted all the materials and equipment for Ross Dam and Powerhouse, 313 feet up the mountainside to the level of Diablo Lake. |